November 3, 2003 (cont'd): Lots of stuff happened in the last couple days. We got gravel in after finding the oil tank and had it put in where the oil tank was and compacted in order to make it strong enough to support the new foundation. Damn oil tank thing added nearly $1k to the job. After that, the plumber came in and hooked up water and replaced the sewer line with the appropriate ABS Schedule 40 black pipe. Today the first inspector from the sewer dept. came and gave us a lecture about putting the water pipe in the same trench as the sewer pipe.
|
|