|
June 6, 2004: We've got all of the floor joists up so now it's time to put on the subflooring plywood. In order to do that, however, we need to be able to get to the floor, so, it's time to build some STAIRS! My dad Doug helped out a LOT in this process. I spent a hideous amount of time drawing this stuff out so that it would be JUST PERFECT when it was built, but that just didn't work out! Here's the beginning..the lower part up to the
|
|